UJ.com

Top 2 

                        SATURDAY, MAY 17, 2025
Make Homepage /  Add Bookmark
Front Page
Nation
Business
Search
Subscription
Advertising
About us
Copyright
Contact
 

   Username:
   Password:


Registration

 
GISMETEO.RU
UJ Week
Top 1   

    
Business    

Zaporizhia aluminum plant ZALK resume operation after long idle period
Journal Staff Report

KYIV, Oct 26 – Zaporizhia aluminum mill ZAlK after a long idle period has started smelting aluminum from secondary metals, an industry source said Monday.

"Today, 300 kg of aluminum have been smelted from secondary raw materials – aluminum scrap," the Interfax-Ukraine's source said.

According to the source, this happened after a long downtime in production activities: "Before that, we had not smelted aluminum for a long time," the source said.




Log in

Print article E-mail article


Currencies (in hryvnias)
  21.03.2025 prev
USD 41.54 41.57
RUR 0.489 0.497
EUR 45.00 45.32

Stock Market
  20.03.2025 prev
PFTS 507.0 507.0
source: PFTS

OTHER NEWS

Ukrainian Journal   
Front PageNationBusinessEditorialFeatureAdvertisingSubscriptionAdvertisingSearchAbout usCopyrightContact
Copyright 2005 Ukrainian Journal. All rights reserved
Programmed by TAC webstudio