The European Investment Bank (EIB) is considering the possibility of issuing a EUR176 million loan for the completion of Tashlyk hydroelectric pumped storage plant operated by Yuzhnoukrainsk nuclear power plant (Mykolaiv region) to increase its capacity in turbine (generator) mode from the current 302 MW up to 906 MW.