KYIV, Jan 21 – Unit three of Trypilska thermal power plant (TPP) on January 18, 2019 was connected to the Ukrainian power grid after its switch from anthracite to long flame coal consumption.
The press service of PJSC Centrenergo reported that the construction and assembly works to re-equip the unit's coal delivery and burning systems with the transfer of units to burn long flame coal were carried out ahead of the schedule.
|