UJ.com

Top 2 

                        TUESDAY, APRIL 16, 2024
Make Homepage /  Add Bookmark
Front Page
Nation
Business
Search
Subscription
Advertising
About us
Copyright
Contact
 

   Username:
   Password:


Registration

 
GISMETEO.RU
UJ Week
Top 1   

    
Business    

DTEK, GE signs contract to build 200-MW wind power farm
Journal Staff Report

KYIV, Oct 18 – DTEK Energy Holding has signed a second contract with U.S. General Electric to supply equipment for Prymorska wind farm with a total capacity of 200 MW, the press service of the holding has reported.

The first contract to supply equipment for Prymorska wind farm (100 MW) was signed in December 2017. It will be completed at the end of 2018.

The second stage of the 100 MW capacity will be also built in Zaporizhia region. The start of construction is the fourth quarter of 2018.




Log in

Print article E-mail article


Currencies (in hryvnias)
  12.04.2024 prev
USD 39.17 39.02
RUR 0.418 0.418
EUR 42.02 42.36

Stock Market
  11.04.2024 prev
PFTS 507.0 507.0
source: PFTS

OTHER NEWS

Ukrainian Journal   
Front PageNationBusinessEditorialFeatureAdvertisingSubscriptionAdvertisingSearchAbout usCopyrightContact
Copyright 2005 Ukrainian Journal. All rights reserved
Programmed by TAC webstudio