KYIV, June 15 – The Ukrainian-German joint enterprise Autostrada (Lviv) has commissioned a mobile asphalt plant in the village of Chervone (Vinnytsia region).
According to the press service of the company, the maximum production capacity of the plant is 160 tonnes of asphalt concrete per hour, the production is fully automated. The plant was launched to produce asphalt for the construction of the M-12 highway on the Vinnytsia-Uman section, which is part of the international transport corridor Go Highway, which will connect the ports of Mykolaiv and Odesa with Poland's Gdansk.
|