KIEV, July 22 – Representatives of the International Atomic Energy Agency on July 19-20 conducted a scheduled inspection of reactor four of Rivne nuclear power plant, at which the scheduled repair is being finished, the press service of National Nuclear Generating Company EnergoAtom has reported.
The press service said that after loading of nuclear fuel to the active zone of the reactor representatives of IAEA conducted a stocktaking of nuclear materials, checking the waste fuel in the reactor's cooling down pond and sealed the transport channel between the reactor and the cooling down pond.
|